WRD GRIP Advance Water Treatment Facility

WRD GRIP: Advanced Water Treatment Facility

Water Replenishment District of Southern California

Location

Pico Rivera, California

Date

2019

Type  

Treatment Plant 

Project Description

As a Consultant to Tetra Tech, GPa is developing an advanced reclaimed water treatment campus that includes an approximately 45,000sf treatment plant process building and an approx. 24,150sf two story Administration and Visitors Building.     

During the course of development, the general architectural aesthetic of the buildings and site landscape concepts and theme have been developed through several phases including community outreach input with the surrounding neighborhoods. The final results of this design went through stages of Design-Build, an architectural philosophy which is consistent with the theme and character that has been established by WRD.


We worked interactively with WRD in order to ensure that the implementation of the final design aligns with the established budget, needs, and goals for the architecture of new facility. Throughout the development of the project, this interaction was realized with workshops. The facility achieved LEED Platinum.

Share by: