Fullerton, California
2014
Corporate Yard
The City obtained GPa for design of their corporate yard facility that included Drying Bed Canopy, material bin storage, and a CNG station. The design of the site walls, access gate and its operating system, and monument sign was also part of the scope of work. GPa was involved in the schematic design through the construction administration process.